Using Project Forecast Writeback

Created by Damien Zwillinger, Modified on Thu, 05 Oct 2023 at 05:50 PM by Gabriel Michaud

Applies to:

  • Velixo NX
  • Velixo Classic
  • Acumatica, MYOB Advanced, Cegid XRP Flex


TABLE OF CONTENTS



Background

If you have Acumatica's Project Forecasting feature enabled, you can view the Project Budget Forecast within Acumatica and see any of the project forecast revisions for the specific project:

 

Acumatica provides the ability to take any revision and make it the budget for the project:

 

 

 

Purpose


The Velixo Project Forecast Writeback feature provides a powerful and flexible method of entering project forecast data.


Important: ... To help with this, we can use the Project Forecast Builder Excel file:

Project Forecast Builder 

and two custom Acumatica Generic Inquiries:

Velixo-ProjectBudget
and
Velixo-Projects  

(you may need to right-click on each of the files and select Save Link as

Once downloaded, the custom inquiries can be imported into Acumatica by a system administrator:

The Excel file is linked to the sample database for the Acumatica Constuction Edition but can be edited to work with any Acumatica database.



  

Example

Watch the video below as Gabriel walks you through the process:

 



Notes: 

Using Project Forecast Writeback with your ERP's multi-factor authentication requires that the ERP's single sign-on ("OAuth2") feature also be enabled.  

Enabling OAuth2 does *not* require an SSO/Advanced Authentication License with Acumatica


  


Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select atleast one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article